43 Upper Clapton Road
CBT Electrical were responsible for the complete Electrical Design of all electrical services throughout the apartments and communal areas.
read more
We worked closely with the Principal Contactor on a daily basis to ensure the Project was completed on time and in budget.
... -
Trinity RC High School
CBT was awarded the contract from London Borough of Redbridge in late July to rewire the ground floor of Trinity RC High School, The contract was completed over a 7 month period due to weekend working only.
read more
... -
Gilbert Colvin Primary School
The electrical service to the main building has been extended and adapted over a number of years. CBT Electrical was awareded the contract to carry out a complete rewire.
This included the supply, delivery and installation of mains electrical switchgear, replacement and renewal of distribution cables, lighting, fire alarm clocks and power installation with additional points and alterations as set out in the specification.
The project was carried out in 5 weeks during th... -
Hanover & Princess Court Laundry
Hanover & Princess Court Laundry
read more
Client: Kier Cambridge
Start-Finish – March 2014 –May 2014
Extension and complete refurbishment of existing laundry room to a community centre, The Project involved an extension to triple the size of the existing building, RSJs were used to span the new opening, a flat roof was installed and a Velux sky light, The building was completely rewired to include panel heating and immersion heaters, A disabled toilet was introduced to conform wi... -
22 The Stow
Client: Kier Harlow
read more
February-April 2014
Complete Refurbishment of a dilapidated shop within a shopping complex in Harlow Town, Work included light demolition of walls, complete rewire, plumbing, floor covering and decorations throughout.
... -
1 The Stow
1 The Stow
read more
Client: Kier Harlow
February-May 2014
Complete Refurbishment of a ground floor office block, The Project involved demolition of existing walls for more usable space, the electrical system was rewired to include new lighting from Fluorel lighting, new small power and distribution, Tann Synchromone supplied and commissioned a new Fire Alarm System, New Partition walls were built, the complete internal walls and ceilings were skimmed and decorated.
Floor covings were vi... -
Bridport Place Phase 1
Bridport Place Phase 1
read more
Client : EHA Group
May – September 2014
Installation of electrical for 8 number apartments, Situated in Islington these flats had a very high finish which included underfloor heating by Wavin, Delta lighting and MK Edge accessories, Following the Project CBT are now the preferred electrical contractor for the EHA Group who have started a number of Projects throughout the City.
... -
The Hansom
The Hansom
read more
Client : EHA Group
April-November 2014
26 apartments in total which included 4 number 1.8m Penthouses, Turnkey finish with a specialist Rako lighting and sound system’s installed, CBT are now an approved Rako installer, The building is in the Heart of Victoria directly beside the Station.
... -
Omega House
Omega House
read more
Client : Kelly Contractors UK
8 apartments within Omega complex in Stratford City, Economy 7 Heating from Dimplex Duo range was used and Led lighting to cut the cost of the electricity bill.
... -
22 The Stow
Client - Kier Harlow
read more
Start - February 2015
Finsih - April 2015
The refurbishment of the shop interior, electrical and building work.
... -
Newham Low Rise Blocks Phase 4B
Client - London Borough of Newham
read more
Project - Upgrade of Electrical Rising Mains, New Communal Lighting for 5 Blocks
Start - 06-01-2014
Finish - 18-03-2014
The works consitsted of the Rewire of Lateral Mains and Landlords Services Installations at 22 N°. 2-4 storey housing blocks, with 3, 6, 9 and 15 dwellings on various floors and the installation of Commulite communal & emergency lighting system.
... -
Newham Tall Blocks Phase 1
Client - London Borough of Newham
read more
Project - Upgrade of Electrical Rising Mains, New Communal Lighting for 2 Blocks
Start - April -2014
Finish - Nov-2014
The works consitsted of the Rewire of Lateral Mains and Landlords Services Installations at 22 N°. 2-4 storey housing blocks, with 3, 6, 9 and 15 dwellings on various floors and the installation of Commulite communal & emergency lighting system.
... -
Langdon School, London Borough of Newham
Client - London Borough of Newham,
read more
Start - July 2013
Finish - Septermber 2013
The Project was a complete New 3 Phase Mains system within tunnels along the length of Langdon School,
... -
Kenneth More Theatre Phase 1
Client: London Borough of Redbridge
read more
Start - July 2014
Finish - October 2014
Installation of lighting and switching, generally using various types of Fluorel luminaires, controlled via local switching, some areas being controlled by Ex-Or lighting management sensors, all as determined by specification and drawings.
...