Projects

  • 43 Upper Clapton Road

    CBT Electrical were responsible for the complete Electrical Design of all electrical services throughout the apartments and communal areas.

    We worked closely with the Principal Contactor on a daily basis to ensure the Project was completed on time and in budget.

     

     

     
    ...

    read more
  • Trinity RC High School

    CBT was awarded the contract from London Borough of Redbridge in late July to rewire the ground floor of Trinity RC High School, The contract was completed over a 7 month period due to weekend working only.

     
    ...

    read more
  • Gilbert Colvin Primary School

     

    The electrical service to the main building has been extended and adapted over a number of years. CBT Electrical was awareded the contract to carry out a complete rewire.

    This included the supply, delivery and installation of mains electrical switchgear, replacement and renewal of distribution cables, lighting, fire alarm clocks and power installation with additional points and alterations as set out in the specification.

    The project was carried out in 5 weeks during th...

    read more
  • Hanover & Princess Court Laundry

    Hanover & Princess Court Laundry

    Client: Kier Cambridge

    Start-Finish – March 2014 –May 2014

    Extension and complete refurbishment of existing laundry room to a community centre, The Project involved an extension to triple the size of the existing building, RSJs were used to span the new opening, a flat roof was installed and a Velux sky light, The building was completely rewired to include panel heating and immersion heaters, A disabled toilet was introduced to conform wi...

    read more
  • 22 The Stow

    Client: Kier Harlow

    February-April 2014

    Complete Refurbishment of a dilapidated shop within a shopping complex in Harlow Town, Work included light demolition of walls, complete rewire, plumbing, floor covering and decorations throughout.
    ...

    read more
  • 1 The Stow

    1 The Stow

    Client: Kier Harlow

    February-May 2014

    Complete Refurbishment of a ground floor office block, The Project involved  demolition of existing walls for more usable space, the electrical system was rewired to include new lighting from Fluorel lighting, new small power and distribution, Tann Synchromone supplied and commissioned a new Fire Alarm System, New Partition walls were built, the complete internal walls and ceilings were skimmed and decorated.

    Floor covings were vi...

    read more
  • Bridport Place Phase 1

    Bridport Place Phase 1

    Client : EHA Group

    May – September 2014

    Installation of electrical for 8 number apartments, Situated in Islington these flats had a very high finish which included underfloor heating by Wavin, Delta lighting and MK Edge accessories, Following the Project CBT are now the preferred electrical contractor for the EHA Group who have started a number of Projects throughout the City. 
    ...

    read more
  • The Hansom

    The Hansom

    Client : EHA Group

    April-November 2014

    26 apartments  in total which included 4 number 1.8m Penthouses, Turnkey finish with a specialist  Rako lighting and sound system’s installed, CBT are now an approved Rako installer, The building is in the Heart of Victoria directly beside the Station.
    ...

    read more
  • Omega House

    Omega House

    Client : Kelly Contractors UK

    8 apartments within Omega complex in Stratford City, Economy 7 Heating from Dimplex Duo range was used and Led lighting to cut the cost of the electricity bill.
    ...

    read more
  • 22 The Stow

    Client - Kier Harlow

    Start - February 2015
    Finsih - April 2015

    The refurbishment of the shop interior, electrical and building work.
    ...

    read more
  • Newham Low Rise Blocks Phase 4B

    Client - London Borough of Newham

    Project - Upgrade of Electrical Rising Mains, New Communal Lighting for 5 Blocks

    Start - 06-01-2014
    Finish - 18-03-2014

    The works consitsted of the Rewire of Lateral Mains and Landlords Services Installations at 22 N°. 2-4 storey housing blocks, with 3, 6, 9 and 15 dwellings on various floors and the installation of Commulite communal & emergency lighting system.
    ...

    read more
  • Newham Tall Blocks Phase 1

    Client - London Borough of Newham

    Project - Upgrade of Electrical Rising Mains, New Communal Lighting for 2 Blocks

    Start - April -2014
    Finish - Nov-2014

    The works consitsted of the Rewire of Lateral Mains and Landlords Services Installations at 22 N°. 2-4 storey housing blocks, with 3, 6, 9 and 15 dwellings on various floors and the installation of Commulite communal & emergency lighting system.
    ...

    read more
  • Langdon School, London Borough of Newham

    Client - London Borough of Newham,

    Start - July 2013
    Finish - Septermber 2013

    The Project was a complete New 3 Phase Mains system within tunnels along the length of Langdon School, 
    ...

    read more
  • Kenneth More Theatre Phase 1

    Client: London Borough of Redbridge

    Start - July 2014 
    Finish - October 2014

    Installation of lighting and switching, generally using various types of Fluorel luminaires, controlled via local switching, some areas being controlled by Ex-Or lighting management sensors, all as determined by specification and drawings. 

     
    ...

    read more
CBT Accreditations
  • Electrical Services

    CBT Electrical offers a wide range of electrical services across London and the South East.